Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Dissertation (MSc (Project Management))--University of Pretoria, 2004.
| Other Authors: | |
|---|---|
| Format: | Thesis |
| Published: |
University of Pretoria
2013
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613554874515456 |
|---|---|
| access_status_str | Open Access |
| author2 | Pienaar, J.S. |
| author_browse | Pienaar, J.S. |
| author_facet | Pienaar, J.S. |
| collection | Thesis |
| dc_rights_str_mv | © 2002, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria |
| description | Dissertation (MSc (Project Management))--University of Pretoria, 2004. |
| format | Thesis |
| id | oai:repository.up.ac.za:2263/27574 |
| institution | University of Pretoria (South Africa) |
| last_indexed | 2026-06-10T12:37:59.731Z |
| license_str | Other — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository |
| publishDate | 2013 |
| publishDateRange | 2013 |
| publishDateSort | 2013 |
| publisher | University of Pretoria |
| publisherStr | University of Pretoria |
| record_format | dspace |
| source_str | UPSpace — University of Pretoria Institutional Repository |
| spelling | oai:repository.up.ac.za:2263/27574 Development of small building contractors in Botswana : a critial evaluation Pienaar, J.S. upetd@ais.up.ac.za Adolwa, Mbaja Critical analysis Performance of beneficiaries Diversion of loan funds UCTD Dissertation (MSc (Project Management))--University of Pretoria, 2004. Botswana has adopted policies in its construction industry aimed at developing its citizen contractors to a standard comparable to any other. Towards this end, it has instituted a number of interventions one of which is to provide these contractors with an advance loan to enable them mobilize on site. This facility greatly enhances their chances of success. This study is an evaluation of this scheme and provides a valuable feedback on the scheme's effectiveness, its shortcomings as well as offering some suggestions as to how its administration can be improved. This it does through a critical analysis of the performance of beneficiaries over a six-year period, identifies reasons for their failure and tries to address concerns of the key players in the application of the scheme. The major findings are that the scheme has not been as successful as expected. The biggest problem seems to be the diversion of loan funds from their intended purpose. Rigorous sustained training of contractors and monitoring of their progress in skills attainment is the recommended solution. The Government's intervention should also target other role players in the industry for support including emerging suppliers and plant leasing companies, to break down existing monopolistic structures. Construction Economics unrestricted 2013-09-07T11:47:23Z 2003-08-28 2013-09-07T11:47:23Z 2002-11-09 2004-08-28 2003-08-27 Dissertation Adolwa, M 2002, Development of small building contractors in Botswana : a critial evaluation, MSc dissertation, University of Pretoria, Pretoria, viewed yymmdd < http://upetd.up.ac.za/thesis/available/etd-08272003-120102/ > http://hdl.handle.net/2263/27574 http://upetd.up.ac.za/thesis/available/etd-08272003-120102/ © 2002, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria application/pdf University of Pretoria |
| spellingShingle | Critical analysis Performance of beneficiaries Diversion of loan funds UCTD Development of small building contractors in Botswana : a critial evaluation |
| title | Development of small building contractors in Botswana : a critial evaluation |
| title_full | Development of small building contractors in Botswana : a critial evaluation |
| title_fullStr | Development of small building contractors in Botswana : a critial evaluation |
| title_full_unstemmed | Development of small building contractors in Botswana : a critial evaluation |
| title_short | Development of small building contractors in Botswana : a critial evaluation |
| title_sort | development of small building contractors in botswana a critial evaluation |
| topic | Critical analysis Performance of beneficiaries Diversion of loan funds UCTD |
| url | http://hdl.handle.net/2263/27574 http://upetd.up.ac.za/thesis/available/etd-08272003-120102/ |