Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Risk management rules for successful global sourcing in large capital projects

Dissertation (MBA)--University of Pretoria, 2013.

Saved in:
Bibliographic Details
Other Authors: Kumar, Dinesh
Format: Thesis
Language:English
Published: University of Pretoria 2014
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613523641630720
access_status_str Open Access
author2 Kumar, Dinesh
author_browse Kumar, Dinesh
author_facet Kumar, Dinesh
collection Thesis
dc_rights_str_mv © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Dissertation (MBA)--University of Pretoria, 2013.
format Thesis
id oai:repository.up.ac.za:2263/40076
institution University of Pretoria (South Africa)
language English
last_indexed 2026-06-10T12:37:30.383Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2014
publishDateRange 2014
publishDateSort 2014
publisher University of Pretoria
publisherStr University of Pretoria
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/40076 Risk management rules for successful global sourcing in large capital projects Kumar, Dinesh ichelp@gibs.co.za Dedasaniya, Mahendra UCTD Risk management Dissertation (MBA)--University of Pretoria, 2013. Global sourcing has become strategically important for all large capital projects in today’s world. This study identified that 11% to over 51% of the budget spent on large capital projects is absorbed by global sourcing. The complexity of global sourcing requires that a multifaceted due diligence scan of the market dynamics and stakeholder interfaces be conducted to ensure that key strategic elements of projects are well understood. There is evidence that when global sourcing risks and challenges are dealt with through a structured and integrated risk management plan, project cost, time and the right level of project quality can be successfully delivered. Furthermore, experience shows that project decisions that are made purely based on capital cost whilst failing to consider the life cycle cost of equipment in terms of capital expenditure to operational expenditure ratio for the life of the project, may prove counterproductive in the long run. This research study set out to investigate the integrated risk management framework necessary to ensure success in global sourcing for large capital projects. It looked at the impact of global sourcing for large capital projects and how pre-emptive risk management practices help to improve project performance. Global experiences and cumulative knowledge was captured from technical experts and project management teams who have handled large projects in various sectors. As a core focus, the research interrogated the most important criteria necessary to measure and ascertain the impact of non-risk adjusted global sourcing on large capital projects in terms of project time, cost and quality. A quantitative study design was adopted to identify the risk management rules for successful global sourcing and measure their impact. Data was collated from large capital projects in 40 countries, six continents through 89 respondents via an online survey tool authenticating the global perspective of this study. A resulting risk management model derived from the consolidated input seeks to introduce a new dimension to the body of project management knowledge related to the executing of large capital projects. mngibs2014 Gordon Institute of Business Science (GIBS) MBA Unrestricted 2014-06-09T06:22:01Z 2014-06-09T06:22:01Z 2014-04-30 2014-06-09 Mini Dissertation Dedasaniya, M 2014-06-09, Risk management rules for successful global sourcing in large capital projects, MBA Mini Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/40076> http://hdl.handle.net/2263/40076 en © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria
spellingShingle UCTD
Risk management
Risk management rules for successful global sourcing in large capital projects
title Risk management rules for successful global sourcing in large capital projects
title_full Risk management rules for successful global sourcing in large capital projects
title_fullStr Risk management rules for successful global sourcing in large capital projects
title_full_unstemmed Risk management rules for successful global sourcing in large capital projects
title_short Risk management rules for successful global sourcing in large capital projects
title_sort risk management rules for successful global sourcing in large capital projects
topic UCTD
Risk management
url http://hdl.handle.net/2263/40076