Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Dissertation (MCom)--University of Pretoria, 2013.
| Other Authors: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
University of Pretoria
2014
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613669945245696 |
|---|---|
| access_status_str | Open Access |
| author2 | Du Preez, Hanneke |
| author_browse | Du Preez, Hanneke |
| author_facet | Du Preez, Hanneke |
| collection | Thesis |
| dc_rights_str_mv | © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. |
| description | Dissertation (MCom)--University of Pretoria, 2013. |
| format | Thesis |
| id | oai:repository.up.ac.za:2263/41571 |
| institution | University of Pretoria (South Africa) |
| language | English |
| last_indexed | 2026-06-10T12:39:49.883Z |
| license_str | Other — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository |
| publishDate | 2014 |
| publishDateRange | 2014 |
| publishDateSort | 2014 |
| publisher | University of Pretoria |
| publisherStr | University of Pretoria |
| record_format | dspace |
| source_str | UPSpace — University of Pretoria Institutional Repository |
| spelling | oai:repository.up.ac.za:2263/41571 Capital Allowances on a power generating plant Du Preez, Hanneke Rajbansi, A.M. Process of manufacture Electricity generation Machinery or plant Environmental assets Auxiliary assets International benchmarking UCTD Dissertation (MCom)--University of Pretoria, 2013. South Africa emerged as a country that fought and overcame arduous oppression.. Following the democratic revolution of 1994, the new government regime embarked on an enormous electrification rollout with the mandate of ensuring all households in the country have access to electricity. This did not come without huge challenges and the electricity supply network was already under pressure. This led to load shedding and in turn impeded economic growth. Consequently South Africa requires significant investment in new electricity infrastructure. In order to ensure sustainable economic growth, the provision of reliable electricity is a critical strategic imperative. One of the objectives (according to the Electricity Regulation Act, No. 4 of 2006) is to facilitate investment in the electricity supply industry. To empower and encourage electricity producers, including foreign investors, to enter into the market, it is imperative to critically assess the current tax allowances available for the construction of power station assets within South Africa's domestic shores. In addition, the concept of load shedding is not limited to South Africa, but is a form of reducing demand on the energy generating system and is experienced internationally. To understand the tax incentives offered by international countries to reduce demand on the electricity supply network, will form part of this assessment. Benchmarking will be done on South Africa's domestic tax incentives offered to local electricity generators against international suppliers of electricity. lmchunu2014 Taxation unrestricted 2014-08-25T07:58:06Z 2014-08-25T07:58:06Z 2014-04-01 2013 Mini Dissertation Rajbansi, AM 2014, Capital Allowances on a power generating plant, MCom dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/41571> F14/4/504/lm http://hdl.handle.net/2263/41571 en © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria |
| spellingShingle | Process of manufacture Electricity generation Machinery or plant Environmental assets Auxiliary assets International benchmarking UCTD Capital Allowances on a power generating plant |
| title | Capital Allowances on a power generating plant |
| title_full | Capital Allowances on a power generating plant |
| title_fullStr | Capital Allowances on a power generating plant |
| title_full_unstemmed | Capital Allowances on a power generating plant |
| title_short | Capital Allowances on a power generating plant |
| title_sort | capital allowances on a power generating plant |
| topic | Process of manufacture Electricity generation Machinery or plant Environmental assets Auxiliary assets International benchmarking UCTD |
| url | http://hdl.handle.net/2263/41571 |