Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine)

Dissertation (MEng)--University of Pretoria, 2014.

Saved in:
Bibliographic Details
Other Authors: Webber-Youngman, R.C.W.
Format: Thesis
Language:English
Published: University of Pretoria 2015
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613530800259072
access_status_str Open Access
author2 Webber-Youngman, R.C.W.
author_browse Webber-Youngman, R.C.W.
author_facet Webber-Youngman, R.C.W.
collection Thesis
dc_rights_str_mv © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Dissertation (MEng)--University of Pretoria, 2014.
format Thesis
id oai:repository.up.ac.za:2263/43270
institution University of Pretoria (South Africa)
language English
last_indexed 2026-06-10T12:37:37.270Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2015
publishDateRange 2015
publishDateSort 2015
publisher University of Pretoria
publisherStr University of Pretoria
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/43270 Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine) Webber-Youngman, R.C.W. gvheerden@angloplat.com Van Heerden, G.M.J. UCTD Dissertation (MEng)--University of Pretoria, 2014. This document describes the re-engineering principles applied in the design of a personnel transportation system for a platinum mine in the Rustenburg area of South Africa. It incorporates conveyor belt travelling, chairlift operation and also includes consideration of proposed changes / modifications to existing conveyor belt infrastructure. The purpose of the project was to identify the appropriate option and / or combination of transportation options through a process of evaluation that would be safe in terms of personnel transportation and cost effectiveness. If alternative measures could be found to transport personnel (in other words not using belt riding as a means of transport), it would have a significant positive spin-off increasing the availability of the belt, to increase production. This document therefore explores the feasibility of new interventions investigated. The design in consideration at the Bafokeng Rasimone Platinum Mine consisted of two shaft systems, namely the North Shaft and South Shaft. Each shaft system comprises of twin decline shafts. One of which is equipped with a conveyor belt for rock and personnel transportation and the other with a winder for track bound material transport. From the date of commissioning of the shafts, the conveyor belt was used for personnel transportation. The conveyor belt is equipped with platforms for getting off and on the belt and a number of safety devices designed to ensure the safety of personnel travelling on the conveyor belt. Intensive training in the practical aspects of belt riding was given to each and every person and unsupervised riding on the belt was only undertaken once belt riding competence was demonstrated. Despite this, the safety results were poor, having experienced 106 injuries between 2006 and May 2013. No fatalities were reported during this period. It was therefore needed to investigate alternative means for personnel transportation or through engineered solutions to the current conveyor belt infrastructure in the safest, most effective and most economical way. There was a major risk of safety related stoppages being imposed following another belt accident / incident. This would prevent the mine from transporting personnel underground by belt and subsequently result in major production losses. From the commissioning of the Phase 2 shaft deepening project on both shafts, the decision was to install dedicated chairlifts for personnel transportation opposed to the man riding conveyor belt installed in the Phase 1 area. The chairlift installations were in operation since 2004 and no chairlift related incidents were recorded thus far. According to safety statistics it was clear that the chairlift installation is the safer method for the transportation of people in the shaft. To fulfil the objectives / scope of this investigation / study, it was recommended that both primary (new chairlift decline with infrastructure) and secondary options (modifications to the current conveyor belt infrastructure) be considered for implementation on both North Shaft and South Shaft to reduce / eliminate accidents / incidents as a result of belt transportation. The associated CAPEX would be approximately ZAR 200 million. Considering the future impact on the business as a whole, this would definitely be CAPEX well spent! lk2014 Mining Engineering MEng Unrestricted 2015-01-19T12:13:22Z 2015-01-19T12:13:22Z 2014/12/12 2014 Dissertation Van Heerden, G 2014, Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine), MEng Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/43270> M14/9/477 http://hdl.handle.net/2263/43270 en © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria
spellingShingle UCTD
Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine)
title Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine)
title_full Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine)
title_fullStr Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine)
title_full_unstemmed Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine)
title_short Engineering principles for the design of a new / existing mine’s personnel transportation system (Case study Bafokeng Rasimone Platinum Mine)
title_sort engineering principles for the design of a new existing mine s personnel transportation system case study bafokeng rasimone platinum mine
topic UCTD
url http://hdl.handle.net/2263/43270