Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Dissertation (MEng)--University of Pretoria, 2014.
| Other Authors: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
University of Pretoria
2015
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613536247611392 |
|---|---|
| access_status_str | Open Access |
| author2 | Xia, Xiaohua |
| author_browse | Xia, Xiaohua |
| author_facet | Xia, Xiaohua |
| collection | Thesis |
| dc_rights_str_mv | © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. |
| description | Dissertation (MEng)--University of Pretoria, 2014. |
| format | Thesis |
| id | oai:repository.up.ac.za:2263/43351 |
| institution | University of Pretoria (South Africa) |
| language | English |
| last_indexed | 2026-06-10T12:37:42.457Z |
| license_str | Other — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository |
| publishDate | 2015 |
| publishDateRange | 2015 |
| publishDateSort | 2015 |
| publisher | University of Pretoria |
| publisherStr | University of Pretoria |
| record_format | dspace |
| source_str | UPSpace — University of Pretoria Institutional Repository |
| spelling | oai:repository.up.ac.za:2263/43351 Optimal metering plan in an energy efficiency project for a ferrochrome plant Xia, Xiaohua Greg.Hlalele@gmail.com Hlalele, Thabo Gregory UCTD Dissertation (MEng)--University of Pretoria, 2014. An accurate measurement of retrofitted loads is essential for the quantification of energy savings in an energy conservation measure project. This research presents an optimal meter placement approach to an ECM project in a ferrochrome plant. The ECM project is implemented in a selected plant in a ferrochrome production line in which three different types of loads are considered for retrofitting. The aim of this research is to minimize the metering costs associated with the measurement and verification process while satisfying the precision and accuracy requirements for the sampling and measurement plan. The metering costs are reduced by using two types of metering devices. One meter yields highly accurate data measurements, has superior functionality to the other meter and is consequently highly priced. Different sampling requirements for the ECM project are evaluated and an optimal solution is found by selecting a combination of inexpensive and expensive metering equipment. The proposed optimal meter placement configuration yields a combination of meters with the highest accuracy in the ECM and has the lowest cost. lk2014 Electrical, Electronic and Computer Engineering MEng Unrestricted 2015-01-19T12:13:33Z 2015-01-19T12:13:33Z 2014/12/12 2014 Dissertation Hlalele, TG 2014, Optimal metering plan in an energy efficiency project for a ferrochrome plant, MEng Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/43351> M14/9/430 http://hdl.handle.net/2263/43351 en © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria |
| spellingShingle | UCTD Optimal metering plan in an energy efficiency project for a ferrochrome plant |
| title | Optimal metering plan in an energy efficiency project for a ferrochrome plant |
| title_full | Optimal metering plan in an energy efficiency project for a ferrochrome plant |
| title_fullStr | Optimal metering plan in an energy efficiency project for a ferrochrome plant |
| title_full_unstemmed | Optimal metering plan in an energy efficiency project for a ferrochrome plant |
| title_short | Optimal metering plan in an energy efficiency project for a ferrochrome plant |
| title_sort | optimal metering plan in an energy efficiency project for a ferrochrome plant |
| topic | UCTD |
| url | http://hdl.handle.net/2263/43351 |