Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Optimal metering plan in an energy efficiency project for a ferrochrome plant

Dissertation (MEng)--University of Pretoria, 2014.

Saved in:
Bibliographic Details
Other Authors: Xia, Xiaohua
Format: Thesis
Language:English
Published: University of Pretoria 2015
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613536247611392
access_status_str Open Access
author2 Xia, Xiaohua
author_browse Xia, Xiaohua
author_facet Xia, Xiaohua
collection Thesis
dc_rights_str_mv © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Dissertation (MEng)--University of Pretoria, 2014.
format Thesis
id oai:repository.up.ac.za:2263/43351
institution University of Pretoria (South Africa)
language English
last_indexed 2026-06-10T12:37:42.457Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2015
publishDateRange 2015
publishDateSort 2015
publisher University of Pretoria
publisherStr University of Pretoria
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/43351 Optimal metering plan in an energy efficiency project for a ferrochrome plant Xia, Xiaohua Greg.Hlalele@gmail.com Hlalele, Thabo Gregory UCTD Dissertation (MEng)--University of Pretoria, 2014. An accurate measurement of retrofitted loads is essential for the quantification of energy savings in an energy conservation measure project. This research presents an optimal meter placement approach to an ECM project in a ferrochrome plant. The ECM project is implemented in a selected plant in a ferrochrome production line in which three different types of loads are considered for retrofitting. The aim of this research is to minimize the metering costs associated with the measurement and verification process while satisfying the precision and accuracy requirements for the sampling and measurement plan. The metering costs are reduced by using two types of metering devices. One meter yields highly accurate data measurements, has superior functionality to the other meter and is consequently highly priced. Different sampling requirements for the ECM project are evaluated and an optimal solution is found by selecting a combination of inexpensive and expensive metering equipment. The proposed optimal meter placement configuration yields a combination of meters with the highest accuracy in the ECM and has the lowest cost. lk2014 Electrical, Electronic and Computer Engineering MEng Unrestricted 2015-01-19T12:13:33Z 2015-01-19T12:13:33Z 2014/12/12 2014 Dissertation Hlalele, TG 2014, Optimal metering plan in an energy efficiency project for a ferrochrome plant, MEng Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/43351> M14/9/430 http://hdl.handle.net/2263/43351 en © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria
spellingShingle UCTD
Optimal metering plan in an energy efficiency project for a ferrochrome plant
title Optimal metering plan in an energy efficiency project for a ferrochrome plant
title_full Optimal metering plan in an energy efficiency project for a ferrochrome plant
title_fullStr Optimal metering plan in an energy efficiency project for a ferrochrome plant
title_full_unstemmed Optimal metering plan in an energy efficiency project for a ferrochrome plant
title_short Optimal metering plan in an energy efficiency project for a ferrochrome plant
title_sort optimal metering plan in an energy efficiency project for a ferrochrome plant
topic UCTD
url http://hdl.handle.net/2263/43351