Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Location Modelling for Coal Consolidation Centres

Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2012.

Saved in:
Bibliographic Details
Main Author: Barends, H.
Other Authors: Willemse, E.J.
Format: Thesis
Language:English
English
Published: University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering 2015
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613567607373824
access_status_str Open Access
author Barends, H.
author2 Willemse, E.J.
author_browse Barends, H.
Willemse, E.J.
author_facet Willemse, E.J.
Barends, H.
author_sort Barends, H.
collection Thesis
dc_rights_str_mv Copyright: University of Pretoria
description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2012.
format Thesis
id oai:repository.up.ac.za:2263/45142
institution University of Pretoria (South Africa)
language English
English
last_indexed 2026-06-10T12:38:12.302Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2015
publishDateRange 2015
publishDateSort 2015
publisher University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
publisherStr University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/45142 Location Modelling for Coal Consolidation Centres Barends, H. Willemse, E.J. University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering Mini-dissertations (Industrial and Systems Engineering) Hub Location Problem, MILP, Location Modelling, Weiszfield Iteration Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2012. The South African inland logistic systems are heavily reliant on existing road networks. The bulk transportation of goods, such as coal, increases the loads the roads currently have to carry and lead to damaged roads that in turn increase logistic costs. For these and other socio-economic reasons the strategic decision has been made by one of the major coal transportation companies in South Africa to migrate the transportation of coal as far as possible from road to rail. To support this strategy, coal consolidation centres are to be optimally located, whereby road-based coal will be diverted to the hubs and transported by rail to the demand point. The purpose of this project is to develop and evaluate mathematical models that could be used by decision makers to determine optimal locations of coal consolidation centres. To ful_ll this aim two mathematical models are developed: a network-based model in which a limited number of prede_ned nodes along the existing rail network can be chosen as hub locations, and the continuous model in which all points on the plane are considered. The two main objectives are to decrease total operational cost and to migrate the transportation as far as possible o_ road and onto rail. A test case is used to highlight strengths, weaknesses and underlying behaviours of the models. The most noteworthy _ndings involve the major weaknesses of both models. The greatest weakness experienced by the network-based model is the limitation of the possible hub locations; improved locations not on the rail network are excluded and could yield improved results. The continuous model eliminates this weakness, however, it does not consider the distance along the rail network in calculating optimal locations. This chosen locations the continuous model yields are numerically inferior to the network-based counterparts. For these reasons the decision is taken to use both models in order to achieve optimal results; the continuous model is used to determine additional hub locations, while the network-based model is used to determine _nal results. In the procedure described above, mathematical models are developed with the capability to guide decision makers in determining optimal coal consolidation centres. The results with regard to the case study are analysed to give recommendations to guide the decision-making process. 2015-05-13T07:46:41Z 2015-05-13T07:46:41Z 2014-11-04 2015-05-13 Mini Dissertation http://hdl.handle.net/2263/45142 en en Copyright: University of Pretoria PDF application/pdf University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
spellingShingle Mini-dissertations (Industrial and Systems Engineering)
Hub Location Problem, MILP, Location Modelling, Weiszfield Iteration
Barends, H.
Location Modelling for Coal Consolidation Centres
title Location Modelling for Coal Consolidation Centres
title_full Location Modelling for Coal Consolidation Centres
title_fullStr Location Modelling for Coal Consolidation Centres
title_full_unstemmed Location Modelling for Coal Consolidation Centres
title_short Location Modelling for Coal Consolidation Centres
title_sort location modelling for coal consolidation centres
topic Mini-dissertations (Industrial and Systems Engineering)
Hub Location Problem, MILP, Location Modelling, Weiszfield Iteration
url http://hdl.handle.net/2263/45142
work_keys_str_mv AT barendsh locationmodellingforcoalconsolidationcentres