Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
_version_ 1867613500440838144
access_status_str Open Access
author2 Webber-Youngman, R.C.W.
author_browse Webber-Youngman, R.C.W.
author_facet Webber-Youngman, R.C.W.
collection Thesis
dc_rights_str_mv © 2017 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Dissertation (MEng)--University of Pretoria, 2016.
format Thesis
id oai:repository.up.ac.za:2263/61326
institution University of Pretoria (South Africa)
language English
last_indexed 2026-06-10T12:37:08.286Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2017
publishDateRange 2017
publishDateSort 2017
publisher University of Pretoria
publisherStr University of Pretoria
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/61326 Investigating the stage-gate model as a research and development implementation process in modernising the mining industry Webber-Youngman, R.C.W. u10501585@tuks.co.za Preis, Eugene Pieter UCTD Stage-gate model Research and development Modernising mining industry Sustainable mining practices Innovation management Engineering, built environment and information technology theses SDG-04 SDG-04: Quality education Engineering, built environment and information technology theses SDG-08 SDG-08: Decent work and economic growth Engineering, built environment and information technology theses SDG-09 SDG-09: Industry, innovation and infrastructure Engineering, built environment and information technology theses SDG-12 SDG-12: Responsible consumption and production Engineering, built environment and information technology theses SDG-17 SDG-17: Partnerships for the goals Dissertation (MEng)--University of Pretoria, 2016. In recent years, innovation in the mining industry has shifted from being a non-essential business activity to a necessity. Key challenges in the last decade (such as declining ore grades and increased mining costs) have forced companies to focus on innovative business initiatives in order to gain incremental cost and productivity improvements. These key challenges have placed the mining industry in a difficult position they are substantial and in many cases, complex in nature. In order to ultimately solve (and not merely mitigate) these challenges, fundamental innovation step-changes are required. The success of the potential implementation of these changes is to rethink the "starting point" of innovation, namely the research and development (R&D) strategy and process. Contrary to popular belief, innovation does not occur spontaneously. It is, in the majority of cases, a product of meticulous planning, thinking, testing, iteration, and implementation. This study investigated the Stage-Gate model as a potential R&D implementation process in solving the aforementioned challenges, and ultimately modernising the South African mining industry. The study focused on firstly deriving a skeleton Stage-Gate model, in order to conduct further research into the associated key gate criteria, stage activities and critical success factors. The research findings were used to develop a proposed Stage-Gate model, which was then assessed at the hand of a South African mining case study (Missing Person Locator System). From the research findings, proposed Stage-Gate model and the case study evaluation, it was generally concluded that the Stage-Gate model has the potential to assist in the successful modernisation of the South African mining industry (SAMI), through focused R&D efforts into the industry's key problem areas and challenges. The study further recommended that in general, the outcomes of the study should be used to conduct R&D in the SAMI, in order to more effectively and efficiently conduct R&D in the SAMI (and ultimately modernise the SAMI). Lastly it was suggested that the outcomes of the study (and in particular, the proposed Stage-Gate model) be tested through conducting an actual R&D effort into a new value proposition. The actual application of the proposed model will reveal the degree of value that the Stage-Gate approach could deliver, and could serve as proof that the Stage-Gate model and approach can work as a tool in modernising the SAMI. om2025 Mining Engineering MEng Unrestricted SDG-04: Quality education SDG-08: Decent work and economic growth SDG-09: Industry, innovation and infrastructure SDG-12: Responsible consumption and production SDG-17: Partnerships for the goals 2017-07-13T13:28:57Z 2017-07-13T13:28:57Z 2017-05-03 2016 Dissertation Preis, EP 2016, Investigating the stage-gate model as a research and development implementation process in modernising the mining industry, MEng Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/61326> A2017 http://hdl.handle.net/2263/61326 en © 2017 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria
spellingShingle UCTD
Stage-gate model
Research and development
Modernising mining industry
Sustainable mining practices
Innovation management
Engineering, built environment and information technology theses SDG-04
SDG-04: Quality education
Engineering, built environment and information technology theses SDG-08
SDG-08: Decent work and economic growth
Engineering, built environment and information technology theses SDG-09
SDG-09: Industry, innovation and infrastructure
Engineering, built environment and information technology theses SDG-12
SDG-12: Responsible consumption and production
Engineering, built environment and information technology theses SDG-17
SDG-17: Partnerships for the goals
Investigating the stage-gate model as a research and development implementation process in modernising the mining industry
title Investigating the stage-gate model as a research and development implementation process in modernising the mining industry
title_full Investigating the stage-gate model as a research and development implementation process in modernising the mining industry
title_fullStr Investigating the stage-gate model as a research and development implementation process in modernising the mining industry
title_full_unstemmed Investigating the stage-gate model as a research and development implementation process in modernising the mining industry
title_short Investigating the stage-gate model as a research and development implementation process in modernising the mining industry
title_sort investigating the stage gate model as a research and development implementation process in modernising the mining industry
topic UCTD
Stage-gate model
Research and development
Modernising mining industry
Sustainable mining practices
Innovation management
Engineering, built environment and information technology theses SDG-04
SDG-04: Quality education
Engineering, built environment and information technology theses SDG-08
SDG-08: Decent work and economic growth
Engineering, built environment and information technology theses SDG-09
SDG-09: Industry, innovation and infrastructure
Engineering, built environment and information technology theses SDG-12
SDG-12: Responsible consumption and production
Engineering, built environment and information technology theses SDG-17
SDG-17: Partnerships for the goals
url http://hdl.handle.net/2263/61326