Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill

Mini Dissertation (BEng)--University of Pretoria, 2016.

Saved in:
Bibliographic Details
Other Authors: Grobler, Jacomine
Format: Thesis
Language:English
Published: University of Pretoria 2017
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613491047694336
access_status_str Open Access
author2 Grobler, Jacomine
author_browse Grobler, Jacomine
author_facet Grobler, Jacomine
collection Thesis
dc_rights_str_mv © 2017 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Mini Dissertation (BEng)--University of Pretoria, 2016.
format Thesis
id oai:repository.up.ac.za:2263/62868
institution University of Pretoria (South Africa)
language English
last_indexed 2026-06-10T12:36:59.347Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2017
publishDateRange 2017
publishDateSort 2017
publisher University of Pretoria
publisherStr University of Pretoria
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/62868 Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill Grobler, Jacomine Croucamp, M. (Marco) UCTD Mini Dissertation (BEng)--University of Pretoria, 2016. Scheduling is a key factor for delivering a quality and reliable product. The sudden interest in scheduling problems over the past forty years emphasizes the new opportunity created by using scheduling tools (K r and Yazgan 2016). Scheduling tools enable companies around the world to minimize non-value added factors like setup times, setup cost and changeovers. On time delivery of products are achieved by optimizing the scheduling of production,(Gupta and Chantaravarapan 2008). This project focuses on a wheat mill in Silverton, Gauteng. This report considers a parallel machine scheduling problem, with sequence dependent setup times for the production of our products. The total demand of each job must be processed at the same time, not allowing preemption. The primary objective of the schedule is to minimize the total production time. A Mathematical programming formulation shall form the basis of solving the problem. Five heuristic rules are used. Results were obtained by running all of the heuristic rules over thirty random demand scenarios. The optimal heuristic rule was determined as the process with the most robustness to change in input data. In this project the largest ushing times heuristic rule performed the best. The heuristic chosen as the best can easily be implemented by the company. No additional resources have to be bought. The solution have been tested against real world data and delivered excellent results. The current run time for the best heuristic rule is 0.0005 seconds. The current scheduling method will schedule all the demand in approximately 23.9 days. The new heuristic rule scheduling method will be able to produce all the demand in just 18.73 days. The nancial impact of implementing the optimal heuristic rule saves the company up to R653.00 on electricity, R430.00 on water and R18 000.00 on overtime per day. That lead to a total savings of R19 083.00 per day. The new heuristic will eliminate four days of production. Equaling the total savings to R76 332.00 for four days. Industrial and Systems Engineering BEng (Industrial) Unrestricted 2017-10-23T08:58:21Z 2017-10-23T08:58:21Z 2017 2016 Mini Dissertation Croucamp, M( 2016, Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill, BEng (Industrial) Mini Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/62868> http://hdl.handle.net/2263/62868 en © 2017 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria
spellingShingle UCTD
Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill
title Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill
title_full Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill
title_fullStr Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill
title_full_unstemmed Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill
title_short Parallel machine scheduling problem with sequence dependent setup times : a case study at a wheat mill
title_sort parallel machine scheduling problem with sequence dependent setup times a case study at a wheat mill
topic UCTD
url http://hdl.handle.net/2263/62868