Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

An investigation on inefficiencies in spare part management processes in South African Power Plants

Dissertation (MEng)--University of Pretoria, 2018.

Saved in:
Bibliographic Details
Other Authors: Coetzee, Jasper L.
Format: Thesis
Language:English
Published: University of Pretoria 2018
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613520794746880
access_status_str Open Access
author2 Coetzee, Jasper L.
author_browse Coetzee, Jasper L.
author_facet Coetzee, Jasper L.
collection Thesis
dc_rights_str_mv © 2018 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Dissertation (MEng)--University of Pretoria, 2018.
format Thesis
id oai:repository.up.ac.za:2263/66195
institution University of Pretoria (South Africa)
language English
last_indexed 2026-06-10T12:37:27.661Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2018
publishDateRange 2018
publishDateSort 2018
publisher University of Pretoria
publisherStr University of Pretoria
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/66195 An investigation on inefficiencies in spare part management processes in South African Power Plants Coetzee, Jasper L. u14353777@tuks.co.za Goliada, Ronewa Emmanuel UCTD Spare part management Power plants Resource optimization Inefficiencies in spare part management Engineering, built environment and information technology theses SDG-09 SDG-09: Industry, innovation and infrastructure Engineering, built environment and information technology theses SDG-07 SDG-07: Affordable and clean energy Engineering, built environment and information technology theses SDG-12 SDG-12: Responsible consumption and production Dissertation (MEng)--University of Pretoria, 2018. Inefficiencies in spare parts management can, and do, have great repercussions for the execution of maintenance in Eskom power stations. Despite this, the sub-processes of spare parts management in power stations had not yet been subjected to rigorous analysis to identify inefficiencies. Consequently, the purpose of this research was to establish the inefficiencies that exist in the management of spare parts in South African power stations, and also to determine the causes of the inefficiencies. All this was done with the intent of recommending a solution to improve spare parts management. It was for this reason that this research was conducted in 13 Eskom coal-fired power stations in South Africa. The first phase of the research was concerned with uncovering and documenting the spare parts management model presently used in Eskom. The second phase included the use of a modified process failure mode and effect analysis (PFMEA) and the Delphi method to identify inefficiencies, their sources, and their significance. The research found that the inefficiencies included unsuitable maintenance and inventory management strategies, as a result of inadequate analysis of plant history. Furthermore, the study established that inadequate analysis of history was a result of poor maintenance records, incompetence, and the lack of access to computerised maintenance management systems (CMMSs). With the inefficiencies and their causes identified, the third phase of the research was then devoted to developing a methodology for improving spare parts management. This led to the development of a framework for improving spare parts management practices in power stations. The framework was validated and verified through a Delphi process. This framework was then recommended for adoption in an Eskom standard procedure for improving spare parts management practices. The research was thus successful in recommending a solution to improve the operational effectiveness and efficiency of spare parts management in South African power stations. mi2025 Mechanical and Aeronautical Engineering MEng Unrestricted SDG-09: Industry, innovation and infrastructure SDG-07: Affordable and clean energy SDG-12: Responsible consumption and production 2018-08-17T09:42:36Z 2018-08-17T09:42:36Z 2005/03/18 2018 Dissertation Goliada, RE 2018, An investigation on inefficiencies in spare part management processes in South African Power Plants, MEng Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/66195> A2018 http://hdl.handle.net/2263/66195 en © 2018 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria
spellingShingle UCTD
Spare part management
Power plants
Resource optimization
Inefficiencies in spare part management
Engineering, built environment and information technology theses SDG-09
SDG-09: Industry, innovation and infrastructure
Engineering, built environment and information technology theses SDG-07
SDG-07: Affordable and clean energy
Engineering, built environment and information technology theses SDG-12
SDG-12: Responsible consumption and production
An investigation on inefficiencies in spare part management processes in South African Power Plants
title An investigation on inefficiencies in spare part management processes in South African Power Plants
title_full An investigation on inefficiencies in spare part management processes in South African Power Plants
title_fullStr An investigation on inefficiencies in spare part management processes in South African Power Plants
title_full_unstemmed An investigation on inefficiencies in spare part management processes in South African Power Plants
title_short An investigation on inefficiencies in spare part management processes in South African Power Plants
title_sort investigation on inefficiencies in spare part management processes in south african power plants
topic UCTD
Spare part management
Power plants
Resource optimization
Inefficiencies in spare part management
Engineering, built environment and information technology theses SDG-09
SDG-09: Industry, innovation and infrastructure
Engineering, built environment and information technology theses SDG-07
SDG-07: Affordable and clean energy
Engineering, built environment and information technology theses SDG-12
SDG-12: Responsible consumption and production
url http://hdl.handle.net/2263/66195