Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Production scheduling of Aluminium Anodising plant

Mini Dissertation (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2017.

Saved in:
Bibliographic Details
Main Author: Behr, Carina
Format: Thesis
Language:English
English
Published: University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering 2019
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613575645757440
access_status_str Open Access
author Behr, Carina
author_browse Behr, Carina
author_facet Behr, Carina
author_sort Behr, Carina
collection Thesis
dc_rights_str_mv © 2017 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Mini Dissertation (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2017.
format Thesis
id oai:repository.up.ac.za:2263/68385
institution University of Pretoria (South Africa)
language English
English
last_indexed 2026-06-10T12:38:19.968Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2019
publishDateRange 2019
publishDateSort 2019
publisher University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
publisherStr University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/68385 Production scheduling of Aluminium Anodising plant Behr, Carina Mini-dissertations (Industrial and Systems Engineering) Production scheduling Anodising Flow shop Mini Dissertation (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2017. Wispeco Aluminium decided to reduce a double line aluminium anodising plant to a single line. This change forces the anodising plant to run at maximum capacity. To be able to run at maximum capacity, it is suggested that a production schedule be put in place to optimise the movement of the cranes and minimise the makespan of a day's work. Production scheduling literature, including the popular / / notation was in- vestigated to assist with identifying the characteristics of the relevant problem. An important characteristic that was identi ed is that the anodising problem is a ow shop problem. Once these characteristics were identi ed, peer-reviewed articles were investi- gated to identify similar problems. An article was identi ed which addresses the multiple cranes that cannot cross over one another, the ow shop characteristic and the parallel machines. This article was used to start formulating an algorithmic model as solution. This algorithm was coded in Python. To ensure that the results generated by the algo- rithm are relevant and correct, the results were compared to actual time-studies. The model tested the in uence of three heuristic scheduling approaches on the makespan of the products. The heuristics tested were FIFO, Priority orders and Shortest Processing Times. The results compared over three production days indicated that the schedule does not have a large impact on the makespan of a day's work. This project suggests that the scheduling on the anodising plant is continued as it currently operates. The current method might not be the optimal solution for any given day, but produces an adequate makespan, which will not disrupt the normal processes that workers are used to. 2019-02-04T13:08:58Z 2019-02-04T13:08:58Z 2017 2017 Mini Dissertation http://hdl.handle.net/2263/68385 en en © 2017 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. PDF application/pdf University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
spellingShingle Mini-dissertations (Industrial and Systems Engineering)
Production scheduling
Anodising
Flow shop
Behr, Carina
Production scheduling of Aluminium Anodising plant
title Production scheduling of Aluminium Anodising plant
title_full Production scheduling of Aluminium Anodising plant
title_fullStr Production scheduling of Aluminium Anodising plant
title_full_unstemmed Production scheduling of Aluminium Anodising plant
title_short Production scheduling of Aluminium Anodising plant
title_sort production scheduling of aluminium anodising plant
topic Mini-dissertations (Industrial and Systems Engineering)
Production scheduling
Anodising
Flow shop
url http://hdl.handle.net/2263/68385
work_keys_str_mv AT behrcarina productionschedulingofaluminiumanodisingplant