Readiness Assessment for Mining Projects

Thesis (PhD)--University of Pretoria, 2020.

Saved in:
Bibliographic Details
Other Authors: Bekker, Giel
Format: Thesis
Language:English
Published: University of Pretoria 2021
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613517800013824
access_status_str Open Access
author2 Bekker, Giel
author_browse Bekker, Giel
author_facet Bekker, Giel
collection Thesis
dc_rights_str_mv © 2019 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
description Thesis (PhD)--University of Pretoria, 2020.
format Thesis
id oai:repository.up.ac.za:2263/78098
institution University of Pretoria (South Africa)
language English
last_indexed 2026-06-10T12:37:24.815Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from UPSpace — University of Pretoria Institutional Repository
publishDate 2021
publishDateRange 2021
publishDateSort 2021
publisher University of Pretoria
publisherStr University of Pretoria
record_format dspace
source_str UPSpace — University of Pretoria Institutional Repository
spelling oai:repository.up.ac.za:2263/78098 Readiness Assessment for Mining Projects Bekker, Giel hardusmulder@gmail.com Mulder, Hardus UCTD Project Management Thesis (PhD)--University of Pretoria, 2020. The front–end planning phase of a project potentially has the biggest impact on the outcome of the implementation phase. Globally, significant research has been conducted into the relationship between the quality of front–end planning and the success of the implementation phase of a project. Several tools have been developed to assess the level of readiness of a project study to proceed into detail design and implementation. However, no such commonly available tool existed for mining projects. The available assessment tools are either generic, not specific to mining projects and therefore do not include many of the elements which are critical to mining projects, or the property of consulting firms. In order to create an Assessment Tool for Mining Project front–end planning, the first step was to evaluate the mining industry and identify all of the elements which should be addressed during a mining project study. This was done through a literature review (which included existing front–end planning evaluation tools), as well as focus groups and surveys. The result was a list of 180 elements which should be considered during a mining project study. To incorporate a metric structure for quantitative evaluation, the Project Definition Readiness Index (PDRI) format as utilized by the Construction Industry Institute (CII) was used. This resulted in the 180 elements being divided into four sections and 18 categories. Since not all elements contributed equally to project success, weights were assigned to each element. The weighting process involved asking experienced mining project professionals to assign weights to each element. After the data were reviewed and adjusted for normality, a weighted list of elements was created which would comprise the Readiness Assessment Tool (RAT) for mining projects. The weighting also provided a quantitative assessment value, based on which a decision can be made about whether or not to proceed to the next project phase. To validate the instrument, the completed RAT for Mining Projects was tested against completed projects. The validation process indicated that there was a significant correlation between the RAT score of a project, and the eventual implementation success. The validation process also highlighted some dominant performance indicators that could influence project results. The performance indicator relating to the performance of the completed project against expectations was found to have the most significant correlation with the RAT score and accounted for 39% of the variability. This was closely followed by the impact of change orders, which had the second–highest correlation to the RAT score (36.2%). Similarly, 8% of the variability in Cost Performance and 7.9% of the variability in Schedule Performance could be explained by the RAT score. The RAT score can explain 3.02% of the variability in the Operating Score of a project and 3.86% of the variability in the Customer Score. By creating a comprehensive, weighted list of elements to be addressed during the front–end phase of a mining project, the RAT for mining projects can assist project team members in coming to a common understanding of the areas which need to be studied, as well as the relative importance of the various elements. The most significant contribution of this study is that project teams can use the RAT as a self–assessment tool during any stage of the project study and identify the areas of the study which require more definition. Teams can also use the RAT to calculate an overall RAT rating at any stage, which will indicate the overall level of readiness to proceed into the next phase of the project. Through assessing the completeness of each of the 180 elements to determine a single RAT score, the RAT can assist project members, as well as decision–makers such as Boards of Directors, to make informed decisions regarding the approval of projects. Finally, depending on the accuracy and reliability of input data, the RAT should improve the probability of a successful project. Graduate School of Technology Management (GSTM) PhD Unrestricted 2021-01-22T10:42:38Z 2021-01-22T10:42:38Z 2021-04-01 2020 Thesis Mulder, H 2020, Readiness Assessment for Mining Projects, PhD Thesis, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/78098> A2021 http://hdl.handle.net/2263/78098 en © 2019 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. application/pdf University of Pretoria
spellingShingle UCTD
Project Management
Readiness Assessment for Mining Projects
title Readiness Assessment for Mining Projects
title_full Readiness Assessment for Mining Projects
title_fullStr Readiness Assessment for Mining Projects
title_full_unstemmed Readiness Assessment for Mining Projects
title_short Readiness Assessment for Mining Projects
title_sort readiness assessment for mining projects
topic UCTD
Project Management
url http://hdl.handle.net/2263/78098