Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Application of lean tools in rolling stock procurement supply chain management

Thesis (MScEng)--Stellenbosch University, 2018.

Saved in:
Bibliographic Details
Main Author: Ekene, Nicholas Umeh
Other Authors: Fourie, Cornelius J.
Format: Thesis
Language:en_ZA
Published: Stellenbosch : Stellenbosch University 2018
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867614091225333760
access_status_str Open Access
author Ekene, Nicholas Umeh
author2 Fourie, Cornelius J.
author_browse Ekene, Nicholas Umeh
Fourie, Cornelius J.
author_facet Fourie, Cornelius J.
Ekene, Nicholas Umeh
author_sort Ekene, Nicholas Umeh
collection Thesis
dc_rights_str_mv Stellenbosch University
description Thesis (MScEng)--Stellenbosch University, 2018.
format Thesis
id oai:scholar.sun.ac.za:10019.1/103379
institution Stellenbosch University (South Africa)
language en_ZA
last_indexed 2026-06-10T12:46:31.699Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from SUNScholar — Stellenbosch University Repository
publishDate 2018
publishDateRange 2018
publishDateSort 2018
publisher Stellenbosch : Stellenbosch University
publisherStr Stellenbosch : Stellenbosch University
record_format dspace
source_str SUNScholar — Stellenbosch University Repository
spelling oai:scholar.sun.ac.za:10019.1/103379 Application of lean tools in rolling stock procurement supply chain management Ekene, Nicholas Umeh Fourie, Cornelius J. Matope, Stephen Stellenbosch University. Faculty of Engineering. Dept. of Industrial Engineering. Lean manufacturing UCTD Supply chain management Rolling stock -- Procurement Thesis (MScEng)--Stellenbosch University, 2018. ENGLISH ABSTRACT: The main aim of this research study was an investigation of applicable lean tools in rolling stock procurement supply chain management (SCM). Lean principles resonate from the manufacturing environment while rolling stock procurement SCM is a typical example of the non-manufacturing environment. Hence a variance in applicable tools is apparent. The case study of the research was studied and analysed. The procedure adopted for measurement and analysis of the case study (rolling stock procurement SCM) began with mapping the process areas. This was performed through a type of lean tool known as value stream mapping. After the SCM mapping, the lean waste in the SCM was identified through waste analysis. During analysis, it was discovered that the bidding process holds the highest area of waste. Following this finding, the bidding process was evaluated, upon which lean tools for waste reduction are prescribed. From the findings obtained in the measurement and analysis step, mapping of the future state was carried out. Based on the mapping of the future state of the supply chain, relevant performance metrics are recommended for a periodic check. Limitations, as well as assumptions encountered during the research study, are also discussed. The study conclusion is presented in the form of answers to the research questions. Some of the major waste discovered in the bidding process includes poor communication between bidding team and end user and difficulty in sourcing for potential suppliers. The recommendations put forward in this research project are to strategically reform the bidding process by making required changes to tender documents, standardising the procurement SCM process and improving the communication culture between suppliers and SCM. AFRIKAANSE OPSOMMING: Die hoofdoel van hierdie navorsingstudie was ʼn ondersoek na toepaslike vaartbelynde instrumente in die voorsieningskettingbestuur (VKB) van die verkryging van rollende materiaal. Vaartbelynde beginsels is van toepassing in die vervaardigingsomgewing. Die VKB van die verkryging van rollende materiaal kom tipies in die nievervaardigingsomgewing voor. ʼn Verskil in toepaslike instrumente is dus voor die hand liggend. Die gevallestudie van die navorsing is bestudeer en ontleed. Die prosedure wat gebruik is vir die meting en ontleding van die gevallestudie (VKB van die verkryging van rollende materiaal) het begin met kartering van die prosesomgewings. Dit is uitgevoer deur ʼn soort vaartbelynde instrument bekend as waardestroomkartering. Ná die VKB-kartering is vaartbelynde verspilling in die VKB deur verspillingsontleding geïdentifiseer. Tydens ontleding is ontdek dat die bieproses die grootste verspilling inhou. Op grond hiervan is die bieproses geëvalueer, en vaartbelynde instrumente vir die vermindering van verspilling word voorgeskryf. Op grond van die bevindinge wat uit die meting-en-ontledingstap verkry is, is kartering van toekomstige toestande uitgevoer. Op grond van die kartering van die toekomstige toestand van die voorsieningsketting word toepaslike prestasiemetrieke vir periodieke kontrole aanbeveel. Beperkings asook aannames wat in die navorsingstudie aan bod kom, word ook bespreek. Die gevolgtrekking van die studie word aangebied in die vorm van antwoorde op die navorsingsvrae. Voorbeelde van die meeste verspilling wat in die bieproses ontdek is, sluit in swak kommunikasie tussen die biespan en eindgebruiker en probleme om potensiële verskaffers te verkry. Die aanbeveling wat deur hierdie navorsingstudie gemaak word, is strategiese hervorming van die bieproses deur nodige veranderinge aan tenderdokumente te maak, die verkrygings-VKB-proses te standaardiseer, en die kommunikasiekultuur tussen verskaffers en die VKB te verbeter 2018-02-19T09:05:33Z 2018-04-09T06:54:29Z 2018-02-19T09:05:33Z 2018-04-09T06:54:29Z 2018-03 Thesis http://hdl.handle.net/10019.1/103379 en_ZA Stellenbosch University 131 pages : illustrations application/pdf Stellenbosch : Stellenbosch University
spellingShingle Lean manufacturing
UCTD
Supply chain management
Rolling stock -- Procurement
Ekene, Nicholas Umeh
Application of lean tools in rolling stock procurement supply chain management
title Application of lean tools in rolling stock procurement supply chain management
title_full Application of lean tools in rolling stock procurement supply chain management
title_fullStr Application of lean tools in rolling stock procurement supply chain management
title_full_unstemmed Application of lean tools in rolling stock procurement supply chain management
title_short Application of lean tools in rolling stock procurement supply chain management
title_sort application of lean tools in rolling stock procurement supply chain management
topic Lean manufacturing
UCTD
Supply chain management
Rolling stock -- Procurement
url http://hdl.handle.net/10019.1/103379
work_keys_str_mv AT ekenenicholasumeh applicationofleantoolsinrollingstockprocurementsupplychainmanagement