Assessing management processes of labour based construction works

Thesis (MScEng (Civil Engineering))--University of Stellenbosch, 2010.

Saved in:
Bibliographic Details
Main Author: Nyando, Cleaverson K.C.
Other Authors: Strasheim, J. A. v B.
Format: Thesis
Language:English
Published: Stellenbosch : University of Stellenbosch 2010
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867614008655216640
access_status_str Open Access
author Nyando, Cleaverson K.C.
author2 Strasheim, J. A. v B.
author_browse Nyando, Cleaverson K.C.
Strasheim, J. A. v B.
author_facet Strasheim, J. A. v B.
Nyando, Cleaverson K.C.
author_sort Nyando, Cleaverson K.C.
collection Thesis
dc_rights_str_mv University of Stellenbosch
description Thesis (MScEng (Civil Engineering))--University of Stellenbosch, 2010.
format Thesis
id oai:scholar.sun.ac.za:10019.1/5322
institution Stellenbosch University (South Africa)
language English
last_indexed 2026-06-10T12:45:13.015Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from SUNScholar — Stellenbosch University Repository
publishDate 2010
publishDateRange 2010
publishDateSort 2010
publisher Stellenbosch : University of Stellenbosch
publisherStr Stellenbosch : University of Stellenbosch
record_format dspace
source_str SUNScholar — Stellenbosch University Repository
spelling oai:scholar.sun.ac.za:10019.1/5322 Assessing management processes of labour based construction works Nyando, Cleaverson K.C. Strasheim, J. A. v B. University of Stellenbosch. Faculty of Engineering. Dept. of Civil Engineering. Labour based works Management processes Process protocol Risks Risk management Dissertations -- Civil engineering Theses -- Civil engineering Thesis (MScEng (Civil Engineering))--University of Stellenbosch, 2010. ENGLISH ABSTRACT: Labour based technology has extensively been utilized in delivery of poverty alleviation programmes. Most of the projects implemented have been of construction in nature. In many cases, labour based works have been characterized with poor performance of not having projects completed within budget, in time and of good quality. Furthermore labour based works projects have been ad hoc in nature, lack spatial focus with no link to national development and sparingly involves engineering skills in its make shift administrative arrangements. Research has shown that most construction problems have been management process related and not product related. This research was initiated as a response to these challenges and represents an attempt to deliver sustainable improved performance of labour based works projects. The research identifies seven phases with various deliverables through the assessment and analysis of management processes of labour based works using the Process Protocol. The Process Protocol based phases consider the whole life cycle of a construction project whilst integrating the process elements under a common framework. To achieve a successful project and process execution, the findings indicate three operational levels of the participants of the activity zone. Several risk factors which need to receive special attention during planning and implementation of labour based works projects have been identified. The practical experiences in responding to, monitoring and controlling of the risk factors are also provided. The analysis of the key sequential phases and documentation of management of labour based works was based on a literature review of conference papers, reports, available project documents and limited interviews with officials involved in public works programmes. Best practices in management of labour based works have been used to follow and synthesise the Process Protocol approach to the management processes of labour based works. AFRIKAANSE OPSOMMING: Arbeid-baseerde tegnologie word algemeen gebruik in programme wat ontwerp is om armoede te verlig. Die meeste van die programme wat geïmplementeer is, het te make met konstruksie. In baie gevalle is hierdie arbeid-baseerde projekte gekenmerk deur swak prestasie en die projekte is nie betyds voltooi nie, daar is nie gehou by die begroting nie, of die gehalte van die werk was swak. Verder is hierdie projekte ad hoc van aard, is daar ’n gebrek aan ruimtelike fokus, is dit nie gekoppel aan nasionale ontwikkeling nie en word daar te min gebruik gemaak van ingenieursvernuf en is die administrasie gebrekkig. Navorsing het bewys dat die meeste konstruksie probleme te wyte is aan bestuurs-prosesses en dat dit nie produk-verwant is nie. Hierdie navorsing is gedoen as gevolg van hierdie probleme en is ’n poging om volhoubare verbeterde prestasie te lewer in arbeid-baseerde projekte. Tydens die navorsing is sewe fases geïdentifiseer d.m.v. die ontleding van bestuursprosesse. Die Proses Protokol is gebruik. Hierdie Proses Protokol gebaseerde fases behels die hele lewens-siklus van ’n konstruksie projek en integreer al die proses komponente in ’n enkel raamwerk. Die bevindinge toon dat daar drie operasionele vlakke van deelnemers in die aktiwiteit sone nodig is om die sukses van ’n projek te verseker. Daar is verskillenmde risiko faktore wat tydens die beplanning en implementering van projekte spesiale aandag moet geniet . Praktiese wenke betreffende die monitor van, reageer op en beheer van risiko faktore word ook verskaf. Die ontleding van sleutel fases en die dokumentasie van die bestuur van arbeid gebaseerde projekte is gebaseer op ’n literatuur oorsig van konferensie verslae, beskikbare projek dokumente en beperkte onderhoude met amptenare wat betrokke was in openbare programme. Daar is gebruik gemaak van beste praktyke in bestuur van arbeid gebaseerde projekte in die sintese van bestuurprosesse vir arbeid gebaseerde projekte. Masters 2010-11-15T08:05:29Z 2010-12-15T10:33:45Z 2010-11-15T08:05:29Z 2010-12-15T10:33:45Z 2010-12 Thesis http://hdl.handle.net/10019.1/5322 en University of Stellenbosch 301 p. application/pdf application/pdf Stellenbosch : University of Stellenbosch
spellingShingle Labour based works
Management processes
Process protocol
Risks
Risk management
Dissertations -- Civil engineering
Theses -- Civil engineering
Nyando, Cleaverson K.C.
Assessing management processes of labour based construction works
title Assessing management processes of labour based construction works
title_full Assessing management processes of labour based construction works
title_fullStr Assessing management processes of labour based construction works
title_full_unstemmed Assessing management processes of labour based construction works
title_short Assessing management processes of labour based construction works
title_sort assessing management processes of labour based construction works
topic Labour based works
Management processes
Process protocol
Risks
Risk management
Dissertations -- Civil engineering
Theses -- Civil engineering
url http://hdl.handle.net/10019.1/5322
work_keys_str_mv AT nyandocleaversonkc assessingmanagementprocessesoflabourbasedconstructionworks