Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Pre-signal study at an at-grade intersection with separate right-turn phase

Thesis (MScEng)--Stellenbosch University, 2015.

Saved in:
Bibliographic Details
Main Author: Tang, Hao
Other Authors: Andersen, Johann
Format: Thesis
Language:en_ZA
Published: Stellenbosch : Stellenbosch University 2015
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613812179337216
access_status_str Open Access
author Tang, Hao
author2 Andersen, Johann
author_browse Andersen, Johann
Tang, Hao
author_facet Andersen, Johann
Tang, Hao
author_sort Tang, Hao
collection Thesis
dc_rights_str_mv Stellenbosch University
description Thesis (MScEng)--Stellenbosch University, 2015.
format Thesis
id oai:scholar.sun.ac.za:10019.1/96484
institution Stellenbosch University (South Africa)
language en_ZA
last_indexed 2026-06-10T12:42:05.565Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from SUNScholar — Stellenbosch University Repository
publishDate 2015
publishDateRange 2015
publishDateSort 2015
publisher Stellenbosch : Stellenbosch University
publisherStr Stellenbosch : Stellenbosch University
record_format dspace
source_str SUNScholar — Stellenbosch University Repository
spelling oai:scholar.sun.ac.za:10019.1/96484 Pre-signal study at an at-grade intersection with separate right-turn phase Tang, Hao Andersen, Johann Stellenbosch University. Faculty of Engineering. Dept. of Civil Engineering. Signalized intersections Traffic engineering Right-turn lanes Traffic signs and signals Thesis (MScEng)--Stellenbosch University, 2015. ENGLISH ABSTRACT: Capacity waste happens when right-turn vehicles have right-of-way during a separate right-turn phase and lanes (e.g., through lanes) of the same approach of the intersection cannot discharge vehicles during that green phase. Right-turn traffic consumes the capacity which otherwise could be provided to through traffic movements at an at-grade signalized intersection. Therefore, it is widely considered that it would lower intersection capacity and increase total delay (Lin, Machemehl, Lee & Herman, 1984). The pre-signal strategy proposed in this research is specifically designed to improve this problem. The following aspects of this strategy were studied in this research, - Capacity benefits of this strategy, - Relationships between the capacity and the length of sorting area (the area between the two signals), - Signal timing of both main signal and pre-signal, - Clearance time of the sorting area, - Main signal phasing options - Signal coordination between the main signal and the pre-signal, - Utilization of the sorting area, and - Pre-signal strategy performance in a simulated environment. The results of this study showed that right-turn movement benefits significantly from this pre-signal strategy. For example, right-turn capacity can be doubled if a presignal is installed on one through lane of an approach with one right-turn lane. It was also found, the maximum approach capacity benefit is not affected significantly by the length of the sorting area for a given green period. The optimal green time and the available pre-signal green time for right-turn movement were also derived in this research. Different main signal phasing options were studied and compared. Phasing options which fit the proposed pre-signal strategy were found. Recommended values for right-turn green time of both signals were given based on different lengths of sorting area. The case study, which compared the performance of some critical movements at the intersection with and without the proposed pre-signal system, confirms the results concluded in this study. A potential problem with this strategy when applied at a real intersection is that it may confuse drivers. Drivers need to be educated and will need time to get familiar with this signal control method. AFRIKAANSE OPSOMMING: Beskermde regsdraaifases vir verkeer by gelykvlak seinbeheerde kruisings gebruik die kapasiteit wat benut kon word deur deurbewegings. Dit verlaag interseksie kapasiteit en totale oponthoud verhoog. Die voorseinstrategie wat in die navorsing studie voorgestel word is spesifiek ontwikkel om die probleem op te los of te verminder. Die volgende aspekte van die strategie is ondersoek in die navorsingsstudie: - Kapasiteitsvoordele van die strategie. - Die verhouding tussen die kapasiteit en die lengte van die sorteringsarea (die area tussen die twee seine). - Seintydstoedeling van beide die hoofseinfase en die voorseinfase. - Ontruimingstyd van die stoorarea. - Hoofseinfaseopsies. - Seinkoordenasie tussen die hoofsein en die voorsein. - Benutting van die sorterings area, en - Voorseinstrategieprestasie in ‘n gesimuleerde omgewing. Die resultate bewys dat die regsdraaibeweging grootliks bevoordeel word nadat die voorseinstrategie ingestel is. Byvoorbeeld, regsdraaikapasiteit kan verdubbel word as ‘n voorseinfase ingestel word op een van die deurlane tesame met ‘n enkele regsdraailaan. Daar is ook gevind dat die kapasiteit nie grootliks beinvloed word deur die lengte van die stoorgebied nie. Die optimale groentyd en die beskikbare voorsein groen tyd vir die regsdraaibeweging is ook afgelei in die navorsing. Verskillende hoofseinfaseopsies is bestudeer en vergelyk. Faseringsopsies vir die voorgestelde voorseinstrategie is gevind. Voorgestelde waardes vir regsdraaigroentyd van voorseine en hoofseine is bereken om kapasiteit te verbeter, gebasseer op verskillende lengtes van die stoorarea. Die gevallestudie wat die prestasie op ‘n aanloop met en sonder die voogestelde voorseinstrategie vergelyk, bewys resultate wat ooreenstem met die bevindinge in die studie. Die verwagte probleem met die voorseinstrategie, wanneer dit ingestel word by ‘n werklike interseksie, is verwarring van die bestuurders. Bestuurders sal opgevoed moet word en sal tyd nodig hê om gewoond te raak aan die voorseinmetode. 2015-04-14T12:25:37Z 2015-04-14T12:25:37Z 2015-03 Thesis http://hdl.handle.net/10019.1/96484 en_ZA Stellenbosch University 137 p. : ill. application/pdf Stellenbosch : Stellenbosch University
spellingShingle Signalized intersections
Traffic engineering
Right-turn lanes
Traffic signs and signals
Tang, Hao
Pre-signal study at an at-grade intersection with separate right-turn phase
title Pre-signal study at an at-grade intersection with separate right-turn phase
title_full Pre-signal study at an at-grade intersection with separate right-turn phase
title_fullStr Pre-signal study at an at-grade intersection with separate right-turn phase
title_full_unstemmed Pre-signal study at an at-grade intersection with separate right-turn phase
title_short Pre-signal study at an at-grade intersection with separate right-turn phase
title_sort pre signal study at an at grade intersection with separate right turn phase
topic Signalized intersections
Traffic engineering
Right-turn lanes
Traffic signs and signals
url http://hdl.handle.net/10019.1/96484
work_keys_str_mv AT tanghao presignalstudyatanatgradeintersectionwithseparaterightturnphase