Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Thesis (PhD)--Stellenbosch University, 2015.
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | en_ZA |
| Published: |
Stellenbosch : Stellenbosch University
2015
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867614026825990144 |
|---|---|
| access_status_str | Open Access |
| author | Potgieter, Izak Johann |
| author2 | Van Rooyen, G. C. |
| author_browse | Potgieter, Izak Johann Van Rooyen, G. C. |
| author_facet | Van Rooyen, G. C. Potgieter, Izak Johann |
| author_sort | Potgieter, Izak Johann |
| collection | Thesis |
| dc_rights_str_mv | Stellenbosch University |
| description | Thesis (PhD)--Stellenbosch University, 2015. |
| format | Thesis |
| id | oai:scholar.sun.ac.za:10019.1/97799 |
| institution | Stellenbosch University (South Africa) |
| language | en_ZA |
| last_indexed | 2026-06-10T12:45:30.338Z |
| license_str | Other — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from SUNScholar — Stellenbosch University Repository |
| publishDate | 2015 |
| publishDateRange | 2015 |
| publishDateSort | 2015 |
| publisher | Stellenbosch : Stellenbosch University |
| publisherStr | Stellenbosch : Stellenbosch University |
| record_format | dspace |
| source_str | SUNScholar — Stellenbosch University Repository |
| spelling | oai:scholar.sun.ac.za:10019.1/97799 Resource-constrained scheduling in the engineering-planning phase of Civil Engineering Projects Potgieter, Izak Johann Van Rooyen, G. C. Stellenbosch University. Faculty of Engineering. Dept. of Civil Engineering. Resource allocation Resource-constrained scheduling Civil engineering projects -- Planning Process modelling UCTD Thesis (PhD)--Stellenbosch University, 2015. ENGLISH ABSTRACT: Project planning and project scheduling have been the subject of scientific research for many years. Yet it is still common to hear of projects that wildly exceeded their budget and time estimations. Research indicates that large discrepancies still exist between project management theory and project management practice. It seems that the theories and techniques developed by academia have struggled to find their way into project management practice. There is a desperate need for industry specific research that can help bridge the gap between project scheduling theory and project scheduling in practice. In very few industries are project escalations as commonplace and severe as in the civil engineering sector. Civil engineering projects that exceed their deadline and/or budget estimations seem to be the norm rather than the exception. This dissertation therefore focussed on project scheduling in the civil engineering context. One specific phase of the engineering process received focus, namely the engineering-planning phase. The scheduling requirements of the engineering-planning phase were investigated, and the attributes of high quality baseline schedules defined. The dissertation took a critical look at whether the scheduling techniques used in practice, or the scheduling techniques proposed by academia can fulfil the rigorous demands of the engineering-phase. It became evident that both of these spheres fall short in this regard. Scheduling techniques used in practice are not optimised, and they ignore some of the most important project constraints. Academic scheduling techniques are not geared for projects of practical size, and the resulting schedules often lack resource-constrained critical paths. Neither of the two spheres pay much attention to the uncertainties that is inherent to the engineering-planning phase. A scheduling framework is introduced that aims to address these shortcomings. Two specific aspects required original work. Meta-heuristic scheduling techniques had to be adapted for projects of practical size, and slack centric resource allocation algorithms had to be developed. The relationship between the input parameters of meta-heuristics and project complexity is investigated, and a new slack maximisation resource allocation algorithm is presented. This dissertation therefore not only provides new insights into the scheduling requirements of the engineering-planning phase, but it also offers project managers with new tools and techniques to generate high quality baseline schedules. AFRIKAANSE OPSOMMING: Geen opsomming beskikbaar Doctoral 2015-12-14T07:42:31Z 2015-12-14T07:42:31Z 2015-12 Thesis http://hdl.handle.net/10019.1/97799 en_ZA Stellenbosch University 149 pages : illustrations application/pdf Stellenbosch : Stellenbosch University |
| spellingShingle | Resource allocation Resource-constrained scheduling Civil engineering projects -- Planning Process modelling UCTD Potgieter, Izak Johann Resource-constrained scheduling in the engineering-planning phase of Civil Engineering Projects |
| title | Resource-constrained scheduling in the engineering-planning phase of Civil Engineering Projects |
| title_full | Resource-constrained scheduling in the engineering-planning phase of Civil Engineering Projects |
| title_fullStr | Resource-constrained scheduling in the engineering-planning phase of Civil Engineering Projects |
| title_full_unstemmed | Resource-constrained scheduling in the engineering-planning phase of Civil Engineering Projects |
| title_short | Resource-constrained scheduling in the engineering-planning phase of Civil Engineering Projects |
| title_sort | resource constrained scheduling in the engineering planning phase of civil engineering projects |
| topic | Resource allocation Resource-constrained scheduling Civil engineering projects -- Planning Process modelling UCTD |
| url | http://hdl.handle.net/10019.1/97799 |
| work_keys_str_mv | AT potgieterizakjohann resourceconstrainedschedulingintheengineeringplanningphaseofcivilengineeringprojects |