Delay and disruption claims and damages in relation to construction projects

Thesis (PhD)--Stellenbosch University, 2016.

Saved in:
Bibliographic Details
Main Author: Malan, Antonie du Toit
Other Authors: Strasheim, J. A. v B.
Format: Thesis
Language:English
Published: Stellenbosch : Stellenbosch University 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867614048913195008
access_status_str Open Access
author Malan, Antonie du Toit
author2 Strasheim, J. A. v B.
author_browse Malan, Antonie du Toit
Strasheim, J. A. v B.
author_facet Strasheim, J. A. v B.
Malan, Antonie du Toit
author_sort Malan, Antonie du Toit
collection Thesis
dc_rights_str_mv Stellenbosch University
description Thesis (PhD)--Stellenbosch University, 2016.
format Thesis
id oai:scholar.sun.ac.za:10019.1/98326
institution Stellenbosch University (South Africa)
language English
last_indexed 2026-06-10T12:45:50.231Z
license_str Other — see source repository
provenance_str_mv Harvested via OAI-PMH from SUNScholar — Stellenbosch University Repository
publishDate 2016
publishDateRange 2016
publishDateSort 2016
publisher Stellenbosch : Stellenbosch University
publisherStr Stellenbosch : Stellenbosch University
record_format dspace
source_str SUNScholar — Stellenbosch University Repository
spelling oai:scholar.sun.ac.za:10019.1/98326 Delay and disruption claims and damages in relation to construction projects Malan, Antonie du Toit Strasheim, J. A. v B. Lubbe, G. F. University of Stellenbosch. Faculty of Engineering. Dept. of Civil Engineering. Damages -- Law and legislation Project management Construction projects -- Risk management UCTD Penalties, Contractual Thesis (PhD)--Stellenbosch University, 2016. ENGLISH ABSTRACT: The project management triangle, also referred to as the “triple constraint” or the “iron triangle”1 is a model of the constraints of project management. The triangle is used to illustrate that the success of project management is measured by the project team’s ability to manage the project so that the expected results are produced while managing time and cost. Events or circumstances may occur during construction contracts which may delay or disrupt the execution of the works or cause loss of productivity. All modern standard-form contracts provide for extending the date for completion under certain defined circumstances, but few contracts, if any, adequately address the question of on what basis exactly the extension of time is to be determined. This uncertainty and inconsistency creates numerous problems for the contractors in planning their work prospectively, and consequent delays may result in severe financial penalties, loss and expenses. This uncertainty and inconsistency may even have the completely opposite effect of relieving the contractor of his obligation to pay penalties and leaving the employer with the unexpected consequence of being obliged to prove its damages. Where the contract does not make express provision for an eventuality or the allocation of risk, the circumstance will be governed by common law. In other words, if the contract is silent on some of above common issues, the parties will be obliged to revert to common law for the outcome of their dispute. The main source of common law in relation to construction law is case law, of which there is a relative dearth in South Africa on the many issues that arise from the interpretation of contractual provisions dealing with delay and disruption in construction projects. It is therefore important for contracts to provide expressly for risk allocation pertaining to possible delaying events and to determine the distinction between time risk and cost risk events. Delay and disruption matters, which may inter alia include issues involving extensions of time, penalties, critical path, ownership of float, concurrent delay, delay analysis methods, global claims, and time at large, among other factors, all too often become disputes that have to be decided by third parties, including inter alia mediators, adjudicators, dispute review boards, arbitrators, and judges. The number of such cases could be substantially reduced by the introduction of an unambiguous and consistent approach. This thesis will address the above concepts by analysing the applicable legal principles involved. This will be done through an analysis of case law and legal writings, and a comparison of different standard contracts from South Africa, England, and, to a lesser extent, other foreign jurisdictions. This analysis will be applied and compared to the newly published JBCC suite of contracts (Edition 6.1 March 2014). Provisions of the JBCC extension of time regimen that are inconsistent and conflicting and may create ambiguity will be identified, and the thesis will propose amendments. Furthermore, provisions which are susceptible to time-at-large arguments will be analysed and appropriate amendments will be proposed. Finally, the thesis will endeavour to introduce Best Practice Project and Risk Management principles through its proposed amendments. AFRIKAANSE OPSOMMING: Geen opsomming Doctoral 2016-03-09T14:05:51Z 2019-12-31T03:00:15Z 2016-03 Thesis http://hdl.handle.net/10019.1/98326 en Stellenbosch University x, 147, 13 leaves application/pdf Stellenbosch : Stellenbosch University
spellingShingle Damages -- Law and legislation
Project management
Construction projects -- Risk management
UCTD
Penalties, Contractual
Malan, Antonie du Toit
Delay and disruption claims and damages in relation to construction projects
title Delay and disruption claims and damages in relation to construction projects
title_full Delay and disruption claims and damages in relation to construction projects
title_fullStr Delay and disruption claims and damages in relation to construction projects
title_full_unstemmed Delay and disruption claims and damages in relation to construction projects
title_short Delay and disruption claims and damages in relation to construction projects
title_sort delay and disruption claims and damages in relation to construction projects
topic Damages -- Law and legislation
Project management
Construction projects -- Risk management
UCTD
Penalties, Contractual
url http://hdl.handle.net/10019.1/98326
work_keys_str_mv AT malanantoniedutoit delayanddisruptionclaimsanddamagesinrelationtoconstructionprojects