Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm

Saved in:
Bibliographic Details
Published in:Applied Computational Intelligence and Soft Computing
Format: Online Article RSS Article
Published: 2026
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1868552842521870338
collection WordPress RSS
FRELIP Feed Integration
container_title Applied Computational Intelligence and Soft Computing
description
discipline_display Mathematics
discipline_facet Mathematics
format Online Article
RSS Article
genre Journal Article
id rss_article:62729
institution FRELIP
journal_source_facet Applied Computational Intelligence and Soft Computing
last_indexed 2026-06-20T21:27:34.457Z
publishDate 2026
publishDateSort 2026
record_format rss_article
spellingShingle Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
Mathematics
General
Mathematics
sub_discipline_display General
sub_discipline_facet General
subject_display Mathematics
General
Mathematics
subject_facet Mathematics
General
Mathematics
title Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
title_alt Mejora de horarios de turnos de construcción con el algoritmo de optimización aritmética de gato de arena
Amélioration des horaires de travail dans la construction avec l'algorithme d'optimisation arithmétique du chat des sables
Aprimorando Escalas de Turno na Construção com o Algoritmo de Otimização Aritmética Gato-Areia
title_auth Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
title_es_txt Mejora de horarios de turnos de construcción con el algoritmo de optimización aritmética de gato de arena
title_fr_txt Amélioration des horaires de travail dans la construction avec l'algorithme d'optimisation arithmétique du chat des sables
title_full Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
title_fullStr Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
title_full_unstemmed Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
title_pt_txt Aprimorando Escalas de Turno na Construção com o Algoritmo de Otimização Aritmética Gato-Areia
title_short Enhancing Construction Shift Schedules With the Sand Cat Arithmetic Optimization Algorithm
title_sort enhancing construction shift schedules with the sand cat arithmetic optimization algorithm
topic Mathematics
General
Mathematics
url https://www.hindawi.com/journals/acisc/2026/9939592/