Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
| Published in: | Energy Transitions |
|---|---|
| Format: | Online Article RSS Article |
| Published: |
2021
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867301670555222021 |
|---|---|
| collection | WordPress RSS FRELIP Feed Integration |
| container_title | Energy Transitions |
| description | |
| discipline_display | Energy |
| discipline_facet | Energy |
| format | Online Article RSS Article |
| genre | Journal Article |
| id | rss_article:73395 |
| institution | FRELIP |
| journal_source_facet | Energy Transitions |
| publishDate | 2021 |
| publishDateSort | 2021 |
| record_format | rss_article |
| spellingShingle | Publisher Correction to: Subsea cable key challenges of an intercontinental power link: case study of Australia–Singapore interconnector Energy General Energy |
| sub_discipline_display | General |
| sub_discipline_facet | General |
| subject_display | Energy General Energy Energy General Energy |
| subject_facet | Energy General Energy |
| title | Publisher Correction to: Subsea cable key challenges of an intercontinental power link: case study of Australia–Singapore interconnector |
| title_auth | Publisher Correction to: Subsea cable key challenges of an intercontinental power link: case study of Australia–Singapore interconnector |
| title_full | Publisher Correction to: Subsea cable key challenges of an intercontinental power link: case study of Australia–Singapore interconnector |
| title_fullStr | Publisher Correction to: Subsea cable key challenges of an intercontinental power link: case study of Australia–Singapore interconnector |
| title_full_unstemmed | Publisher Correction to: Subsea cable key challenges of an intercontinental power link: case study of Australia–Singapore interconnector |
| title_short | Publisher Correction to: Subsea cable key challenges of an intercontinental power link: case study of Australia–Singapore interconnector |
| title_sort | publisher correction to: subsea cable key challenges of an intercontinental power link: case study of australia–singapore interconnector |
| topic | Energy General Energy |
| url | https://link.springer.com/article/10.1007/s41825-020-00034-x |