The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)

Saved in:
Bibliographic Details
Published in:Ge-STRAM
Format: Online Article RSS Article
Published: 2026
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1868553361777754112
collection WordPress RSS
FRELIP Feed Integration
container_title Ge-STRAM
description
discipline_display Electrical and Electronics
discipline_facet Electrical and Electronics
format Online Article
RSS Article
genre Journal Article
id rss_article:74436
institution FRELIP
journal_source_facet Ge-STRAM
last_indexed 2026-06-20T21:35:10.452Z
publishDate 2026
publishDateSort 2026
record_format rss_article
spellingShingle The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
Electrical and Electronics
General
Electrical and Electronics
sub_discipline_display General
sub_discipline_facet General
subject_display Electrical and Electronics
General
Electrical and Electronics
subject_facet Electrical and Electronics
General
Electrical and Electronics
title The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_alt Evaluación del control de tiempo y costo de proyectos de construcción utilizando el método del valor ganado (caso de estudio de construcción de un canal U-Ditch 200/200 con cubierta de eje de 10 toneladas en Jl. Simo Kwagean)
The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_auth The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_es_txt Evaluación del control de tiempo y costo de proyectos de construcción utilizando el método del valor ganado (caso de estudio de construcción de un canal U-Ditch 200/200 con cubierta de eje de 10 toneladas en Jl. Simo Kwagean)
title_fr_txt The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_full The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_fullStr The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_full_unstemmed The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_pt_txt The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_short The Evaluation of Construction Project Time and Cost Control Using the Earned Value Method (Case Study of Construction of a 200/200 U-Ditch Channel with 10 ton Axle Cover on Jl. Simo Kwagean)
title_sort the evaluation of construction project time and cost control using the earned value method (case study of construction of a 200/200 u-ditch channel with 10 ton axle cover on jl. simo kwagean)
topic Electrical and Electronics
General
Electrical and Electronics
url https://ejournal.unitomo.ac.id/index.php/gestram/article/view/11062