Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

4D schedule generation for flat slab BIM models

Planning & scheduling has made some amazing progress in the past 20 years, a period when numerous site engineers felt that utilizing formal planning was unnecessary to everyday operations and a period expending diversion. From that point forward, it has turned into a necessary piece for most project...

Full description

Saved in:
Bibliographic Details
Main Author: Hosny, Amir Ossama
Format: Thesis
Published: AUC Knowledge Fountain 2017
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!