Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Is nuclear power a cost optimal solution for Kenya's electricity generation mix?

In 2010, the adoption of nuclear power was declared a national priority in Kenya. Thereafter, a target of obtaining 4000 MW of nuclear power by the year 2030 was documented in Kenya's Least Cost Power Development Plan (LCPDP) 2010-2031. The nuclear target has drawn a lot of opposition from some Keny...

Full description

Saved in:
Bibliographic Details
Main Author: Odera, Sarah
Other Authors: Stone, Adrian
Format: Thesis
Language:English
Published: Energy Research Centre 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!