A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is ei...
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | English |
| Published: |
Department of Mechanical Engineering
2014
|
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613155985719296 |
|---|---|
| access_status_str | Open Access |
| author | Mortlock, Steven Peter |
| author2 | Vicatos, George |
| author_browse | Mortlock, Steven Peter Vicatos, George |
| author_facet | Vicatos, George Mortlock, Steven Peter |
| author_sort | Mortlock, Steven Peter |
| collection | Thesis |
| description | A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is either driven by a steam turbine or an electric motor and the BFP is the highest auxiliary power consumer within the power station. In the 13 Eskom generating fossil fired power stations the installed BFPs consume approximately 1000 MWs of auxiliary power continuously. The focus of the study is to understand how the BFPs efficiency changes with time as a result of increased internal clearances and the effect this has on the auxiliary power consumption. An in-depth analysis of the efficiency degradation has been studied to understand the contributing factors to these changes and specifically the change in leakage rate and friction in the annular seals of the impellers and axial thrust balancing devices. |
| format | Thesis |
| id | oai:open.uct.ac.za:11427/8704 |
| institution | University of Cape Town (South Africa) |
| language | eng |
| last_indexed | 2026-06-10T12:31:38.662Z |
| license_str | Not specified — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository |
| publishDate | 2014 |
| publishDateRange | 2014 |
| publishDateSort | 2014 |
| publisher | Department of Mechanical Engineering |
| publisherStr | Department of Mechanical Engineering |
| record_format | dspace |
| source_str | UCTD — University of Cape Town Open Access Repository |
| spelling | oai:open.uct.ac.za:11427/8704 Optimum time to refurbish a boiler feed pump at Eskom's power stations Mortlock, Steven Peter Vicatos, George A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is either driven by a steam turbine or an electric motor and the BFP is the highest auxiliary power consumer within the power station. In the 13 Eskom generating fossil fired power stations the installed BFPs consume approximately 1000 MWs of auxiliary power continuously. The focus of the study is to understand how the BFPs efficiency changes with time as a result of increased internal clearances and the effect this has on the auxiliary power consumption. An in-depth analysis of the efficiency degradation has been studied to understand the contributing factors to these changes and specifically the change in leakage rate and friction in the annular seals of the impellers and axial thrust balancing devices. 2014-10-21T13:47:13Z 2014-10-21T13:47:13Z 2014 Master Thesis Masters MSc http://hdl.handle.net/11427/8704 eng application/pdf Department of Mechanical Engineering Faculty of Engineering and the Built Environment University of Cape Town |
| spellingShingle | Mortlock, Steven Peter Optimum time to refurbish a boiler feed pump at Eskom's power stations |
| thesis_degree_str | Master's |
| title | Optimum time to refurbish a boiler feed pump at Eskom's power stations |
| title_full | Optimum time to refurbish a boiler feed pump at Eskom's power stations |
| title_fullStr | Optimum time to refurbish a boiler feed pump at Eskom's power stations |
| title_full_unstemmed | Optimum time to refurbish a boiler feed pump at Eskom's power stations |
| title_short | Optimum time to refurbish a boiler feed pump at Eskom's power stations |
| title_sort | optimum time to refurbish a boiler feed pump at eskom s power stations |
| url | http://hdl.handle.net/11427/8704 |
| work_keys_str_mv | AT mortlockstevenpeter optimumtimetorefurbishaboilerfeedpumpateskomspowerstations |