Optimum time to refurbish a boiler feed pump at Eskom's power stations

A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is ei...

Full description

Saved in:
Bibliographic Details
Main Author: Mortlock, Steven Peter
Other Authors: Vicatos, George
Format: Thesis
Language:English
Published: Department of Mechanical Engineering 2014
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613155985719296
access_status_str Open Access
author Mortlock, Steven Peter
author2 Vicatos, George
author_browse Mortlock, Steven Peter
Vicatos, George
author_facet Vicatos, George
Mortlock, Steven Peter
author_sort Mortlock, Steven Peter
collection Thesis
description A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is either driven by a steam turbine or an electric motor and the BFP is the highest auxiliary power consumer within the power station. In the 13 Eskom generating fossil fired power stations the installed BFPs consume approximately 1000 MWs of auxiliary power continuously. The focus of the study is to understand how the BFPs efficiency changes with time as a result of increased internal clearances and the effect this has on the auxiliary power consumption. An in-depth analysis of the efficiency degradation has been studied to understand the contributing factors to these changes and specifically the change in leakage rate and friction in the annular seals of the impellers and axial thrust balancing devices.
format Thesis
id oai:open.uct.ac.za:11427/8704
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:31:38.662Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2014
publishDateRange 2014
publishDateSort 2014
publisher Department of Mechanical Engineering
publisherStr Department of Mechanical Engineering
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/8704 Optimum time to refurbish a boiler feed pump at Eskom's power stations Mortlock, Steven Peter Vicatos, George A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is either driven by a steam turbine or an electric motor and the BFP is the highest auxiliary power consumer within the power station. In the 13 Eskom generating fossil fired power stations the installed BFPs consume approximately 1000 MWs of auxiliary power continuously. The focus of the study is to understand how the BFPs efficiency changes with time as a result of increased internal clearances and the effect this has on the auxiliary power consumption. An in-depth analysis of the efficiency degradation has been studied to understand the contributing factors to these changes and specifically the change in leakage rate and friction in the annular seals of the impellers and axial thrust balancing devices. 2014-10-21T13:47:13Z 2014-10-21T13:47:13Z 2014 Master Thesis Masters MSc http://hdl.handle.net/11427/8704 eng application/pdf Department of Mechanical Engineering Faculty of Engineering and the Built Environment University of Cape Town
spellingShingle Mortlock, Steven Peter
Optimum time to refurbish a boiler feed pump at Eskom's power stations
thesis_degree_str Master's
title Optimum time to refurbish a boiler feed pump at Eskom's power stations
title_full Optimum time to refurbish a boiler feed pump at Eskom's power stations
title_fullStr Optimum time to refurbish a boiler feed pump at Eskom's power stations
title_full_unstemmed Optimum time to refurbish a boiler feed pump at Eskom's power stations
title_short Optimum time to refurbish a boiler feed pump at Eskom's power stations
title_sort optimum time to refurbish a boiler feed pump at eskom s power stations
url http://hdl.handle.net/11427/8704
work_keys_str_mv AT mortlockstevenpeter optimumtimetorefurbishaboilerfeedpumpateskomspowerstations