Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is ei...
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | English |
| Published: |
Department of Mechanical Engineering
2014
|
| Tags: |
No Tags, Be the first to tag this record!
|