Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing c...
| Format: | Article |
|---|---|
| Published: |
2008
|
| Tags: |
No Tags, Be the first to tag this record!
|
| LEADER | 00000njm a2000000a 4500 | ||
|---|---|---|---|
| 001 | oai:repository.ui.edu.ng:123456789/1957 | ||
| 042 | |a dc | ||
| 720 | |a Adeyeye, A. D. |e author | ||
| 720 | |a Charles-Owaba, O. E. |e author | ||
| 260 | |c 2008 | ||
| 520 | |a The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%. | ||
| 024 | 8 | |a 1012-277X | |
| 024 | 8 | |a South African Journal of Industrial Engineering 19(2), pp.197-209 | |
| 024 | 8 | |a ui_art_adeyeye_goal_2008 | |
| 024 | 8 | |a http://ir.library.ui.edu.ng/handle/123456789/1957 | |
| 245 | 0 | 0 | |a Goal programming model for production planning in a toothpaste factory |