Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing c...
| Format: | Article |
|---|---|
| Published: |
2008
|
| Tags: |
No Tags, Be the first to tag this record!
|